Wembley


On this project our team were tasked with optimizing the thermal performance and protection of the facility’s pipework system. This involved the installation of PIB (Polyisobutene) over Phenolic pipework externally, along with integrated trace heating. These solutions were tailored to ensure the pipework operates at maximum efficiency, provides energy savings and long-term system reliability.